Assembling the CUORE-0 tower
Working on the cryostat
Completed CUORE-0 tower
Detectors being stored under nitrogen
Detector tower bonding machine
A CUORE engineer operates a custom-built cart to position a tower under the cryostat
4-Kelvin cryostat plate, before installation
CUORE tower in glovebox during assembly
Wire bonding the CUORE-0 tower
Preparing to assemble CUORE-0
Tower assembly in a glove box
CUORE Detector Array
Cryostat plates with calibration source guide tubes
The detectors were installed in a specially constructed cleanroom to protect them from naturally occurring radioactivity, including air filtered to remove radon gas
Bottom view of the 19 CUORE towers installed in the cryostat
Upper cryostat plates, before being instrumented
Gluing robotic arms
CUORE-0 tower inside 10 mK shield, from below
While the cryostat is open, the detectors are stored in a nitrogen-filled protective bag
Bonding a detector tower
Rendering of the CUORE cryostat with detectors