CUORE tower in glovebox during assembly
Upper cryostat plates, before being instrumented
Preparing to assemble CUORE-0
The detectors were installed in a specially constructed cleanroom to protect them from naturally occurring radioactivity, including air filtered to remove radon gas
Detectors being stored under nitrogen
Detector tower bonding machine
A CUORE engineer operates a custom-built cart to position a tower under the cryostat
Wire bonding the CUORE-0 tower
Working on the cryostat
Bottom view of the 19 CUORE towers installed in the cryostat
Bonding a detector tower
Assembling the CUORE-0 tower
Completed CUORE-0 tower
While the cryostat is open, the detectors are stored in a nitrogen-filled protective bag
Tower assembly in a glove box
CUORE Detector Array
Cryostat plates with calibration source guide tubes
4-Kelvin cryostat plate, before installation
CUORE-0 tower inside 10 mK shield, from below
Rendering of the CUORE cryostat with detectors
Gluing robotic arms